The refueling station is located in London, UK. All devices of the station are integrated in a standard container. HQHP is authorized to provide remote technical support for the station. It was put into operation in 2014 and has been working properly since then.
The refueling station is located in Wellingborough, UK and designed with standard container structure. It was put into operation in 2015 and has been working properly since then.
This station is suitable for extremely low temperature (-40°C) application.
The refueling station is located in Moscow, Russia. All devices of the refueling station are integrated in a standard container. It is the first LNG refueling tank in Russia in which the natural gas is liquefied on the site.
The refueling station is located in Louny, Czech. It is the first LNG refueling station in Czech for vehicles and civil applications. The station was completed in 2017 and has been working properly since then.
The equipment is provided with modular and skid design and complies with relevant standards of CE certification, with advantages as minimized installation and commissioning works, short commissioning time and convenient operation. It is the first LNG cylinder refueling station in Singapore and has contributed to the development of enriched energy structure of Singapore.
The refueling station is located in Kaduna, Nigeria. This station is the first LNG refueling station in Nigeria. It was completed in 2018 and has been working properly since then.
The LNG refueling station is located in Ramjih, Nigeria. It is the first LNG tanker refueling station in Nigeria.
The refueling station is located in Qarshi, Uzbekistan, with high refueling efficiency. It was put into operation since 2017, with daily sales of 40,000 standard cubic meters.
It is a CNG mother station and was put into operation since 2016.
The refueling station was put into operation in 2010.
The CNG refueling station was put into operation in 2008.
The refueling station was put into operation in 2018.
The station is located in Zhengjiabao, Yanchi County, Wuzhong City, Ningxia Hui Autonomous Region. It is the first combined petrol and gas refueling station constructed by PetroChina in Ningxia.
The station is the largest petrol and gas refueling station in Yinchuan City, Ningxia.
The station is constructed after Yushu Earthquake. It is the first combined LNG+L-CNG and peak shaving station in Yushu for vehicles, civil use and peak shaving.
The station is located at Meishan Lake Road, Jinzhai County, Anhui. It is the first LNG+L-CNG integrated refueling station in Anhui Province.
The station is located in Qiuhu, Zhejiang. It is the first full skid-mounted LNG refueling station constructed by Sinopec in Zhejiang.
The station is located in Xingren Service Area along G6Beijing-Lhasa Expressway.
Top